


Orders placed during Passover Holiday (Wed 4/1 after 4PM ET – Thurs 4/9) will ship Fri 4/10. View our holiday shipping schedule.
This item is no longer available.
Review Summary
Universal mount for projectors with 3" of post installation shift (side to side or front to back)
Mount to 1.5" NPT pipe or flush mount directly to ceiling. Install in either lateral or front to back orientation. Allows post-installation shift of up to 3". A total of 12 adjustment points; 6 for pitch and 6 for roll to ensure that projector stays in place and does not slip after installation.
3" of post installation adjustment either front to back or lateral
Completely pre-assembled mounting interface for quick installation
Fully adjustable roll, pitch and yaw
12 total adjustment points; 6 for pitch and 6 for roll
Mounts to any 1.5" NPT threaded pipe or mounts flush to the ceiling
Pre-sorted hardware pack for easy installation